SOLAR POWER PROJECT HCMC – 3.6MWP

1. Introduction of the solar power project in Ho Chi Minh City

Solar power project in Ho Chi Minh City connected to the grid with a capacity of 3.6MW was FOCUS SOLAR completed construction, installation and put into use from September 2020 in Binh Tan district.

Up to now, the system uses all solar power during the day, only using electricity from the grid at night, saving significant electricity costs for investors. Besides, the solar power system helps to reduce grid overload at peak hours, helping the plant to operate stably.

The system operates completely automatically, which is controlled by engineers FOCUS SOLAR SCADA monitoring remotely over the Internet. Simultaneously, FOCUS SOLAR warranty, regular system maintenance (3 months/time) for the purpose of cleaning panels, checking power cables, taking care of inverter and electrical cabinets. 

2. Basic information of Ho Chi Minh City solar power project

ĐỊA ĐIỂM DỰ ÁN ĐIỆN MẶT TRỜI

PLACE

AVAL – Binh Tan, HCMC

dự án điện mặt trời

PROJECT SIZE

3.6MWp

dự án điện mặt trời thành phố

DEVICE

445Wp JA SOLAR panels

SHP75-10 SMA Inverters

DỰ ÁN ĐIỆN MẶT TRỜI 3.6 MWP BÌNH TÂN

Project: Rooftop Solar Power 3.6MWP in AVAL - Average front

3. Photo of the solar power project in Ho Chi Minh City

sản lượng điện 2021
dự án điện mặt trời
z2430004332922_de1729b19b89806e014977371c472d40
Project output chart
c7e89aea90965cc8058717
tam-pin-nang-luong-mat-troi
25971b6116a5dafb83b411
previous arrow
next arrow
z2430004332922_de1729b19b89806e014977371c472d40
biểu đồ sản lượng tạo ra của dự án
c7e89aea90965cc8058717
tam-pin-nang-luong-mat-troi
25971b6116a5dafb83b411
previous arrow
next arrow

OTHER PROJECTS

error: Please don't copy!!
icons8-exercise-96 challenges-icon chat-active-icon